Manned 24 hour Call-out Service

Grosvenor Casino, Aberdeen


Client: Grosvenor Casino
Completion date: June 24
HF divisions involved:
Electrical

Brief Project Description: The Grosvenor Casino in Aberdeen is a popular gaming venue in the Granite City. As the venue looked to upgrade their premises, they turned to HF to tackle the issues that had been having with the lighting in its gaming area. The area was poorly illuminated due to multiple faulty fittings, which detracted from the overall gaming experience and created a less inviting atmosphere for patrons. To address these issues, a decision was made to undertake a comprehensive lighting upgrade.

The primary objective was to enhance the lighting in the gaming area by replacing the existing 60 faulty fittings with bespoke LED fittings. These new fittings were custom-made to suit the specific requirements of the casino’s ceiling, ensuring both aesthetic and functional improvements.

led lighting upgrade for casino in aberdeen

The project was meticulously planned to minimise disruption to the casino’s operations. The gaming area was only accessible by our electricians to work in after closing to the public, which was at 5:30 AM. This timing allowed our Aberdeen electricians to work through the early morning hours to ensure the area was ready for use by opening hours that afternoon.

The installation process was scheduled over four consecutive days. Our team of skilled electricians complete the following steps:

  1. Removal of Faulty Fittings: The old, faulty lighting fixtures were carefully removed to prevent any damage to the ceiling or surrounding structures.
  2. Installation of Bespoke LED Fittings: The new custom-made LED fittings were installed. These fittings were specifically designed to enhance the lighting quality and were tailored to the unique design of the ceiling in the gaming area.
  3. Testing and Adjustments: After installation, each fitting was tested to ensure optimal performance. Necessary adjustments were made to achieve the desired lighting effects and to ensure uniform illumination throughout the gaming area.

Project Challenges: The restricted working hours posed a challenge, as our electricians had to complete the work within a tight window each day. This was addressed through careful planning and efficient work processes, ensuring that all tasks were completed on schedule.

The bespoke nature of the LED fittings required precise installation to meet the aesthetic and functional requirements. Our expertise and prior experience in similar projects in the hospitality industry ensured that the fittings were installed correctly and met the high standards set by the casino.

By turning to LED Lighting, the Casino has improved the lighting quality in their gaming area, creating a brighter and more inviting environment for patrons. The LED fittings are more energy-efficient compared to the old fixtures, resulting in reduced energy consumption and lower operational costs for the casino while the bespoke design of the fittings complements the casino’s interior design, enhancing the overall visual appeal of the gaming area.

The successful installation of bespoke LED lighting at the Grosvenor Casino in Aberdeen highlights the importance of tailored solutions and meticulous planning in achieving project goals. The enhanced lighting has not only improved the functional aspects of the gaming area but also contributed to the overall ambiance and customer experience, demonstrating the value of investing in high-quality, custom-designed fixtures. This project serves as an example of how strategic upgrades can have a positive impact on both operational efficiency and customer satisfaction in the hospitality and entertainment industry. And at HF, our electricians can complete the full range of installation, maintenance and emergency call out work for customers nationwide.

We have proven time and time again that our experience and quality deliver results in demanding industries such as hospitality where reliability, dependability and quality are highly sought after.

If you would like to know more about the work we can provide in the hospitality sector, please contact us today.  With branches nationwide, we can offer our full range of services including Manned 24 Hour Call-out Services for customers across the country.

 

facilities management case studies
CASE STUDIES

Browse our latest case studies...

LATEST NEWS
Protect Your Boiler and Pipes from Freezing Issues

Winter Maintenance for your boiler system Winter brings frosty mornings, snow-covered landscapes and unfortunately, freezing conditions that can wreak havoc on your heating systems. One of the most common issues our Mechanical Division deals with during winter is boiler breakdowns caused by frozen pipes. These failures can disrupt homes and businesses, leaving properties without heat […]