The James Weir Building, the third-largest facility on the University of Strathclyde’s John Anderson Campus in Glasgow, houses three departments within the Faculty of Engineering: Chemical and Process Engineering, Design, Manufacture & Engineering Management, and Mechanical & Aerospace Engineering. With a capacity of over 650 students at any one time, the building plays a central role in the university’s teaching and research activities.
Following a devastating fire on 7th February 2012 that affected six floors of the building, temporary facilities were provided across local cinemas and campus buildings to ensure minimal disruption to students’ studies. HF was proud to contribute to the restoration works, delivering critical electrical services to return the building to full operation.
Scope of Works
Replacement of LV switchgear
Full reinstallation of lighting and power systems
Fire alarm replacement and commissioning
All works were completed in strict accordance with the client’s timelines, ensuring the building was restored efficiently and safely to its former standard.
The James Weir is the 3rd largest building on the University of Strathclyde’s John Anderson Campus, located in Glasgow’s city centre. It is home to 3 faculties, The Department of Chemical and Process Engineering, The Department of Design, Manufacture & Engineering Management and The Department of Mechanical & Aerospace Engineering, all of which are part of the Faculty of Engineering.
The building is capable of holding over 650 + students at any one time, so when fire devastated 6 floors of this building on the 7th February 2012 the challenges were great, temp facilities, in the form of local cinemas and other buildings around the campus and plans were quickly put in place to ensure minimal disruption to students studies and to restore the building back to its former glory.
HF are proud to be have been involved in the restoration works and our tasks included the replacement of LV Switchgear, lighting, power and fire alarms and all works were completed in line with the clients strict timescales.