Following an emergency call-out after a local power cut, the HF HVACR team diagnosed terminal PCB failures on two legacy, 14-year-old air conditioning systems at Wren Kitchens in Paisley. Rather than patching obsolete infrastructure, we collaborated closely with our client, Penguin FM, to propose a forward-thinking, sustainable replacement strategy.
By replacing the aging units with modern, energy-efficient R32 systems, upgrading the supporting pipework, and future-proofing the branch against escalating R410A phase-out costs, we delivered an economical, high-performance climate solution that ensures long-term operational resilience for the retail venue.


When a critical commercial site suffers a sudden power interruption, the immediate priority is asset stabilisation. Following a recent power cut at the prominent Wren Kitchens showroom in Paisley, our HVACR team was rapidly deployed on an emergency call-out to investigate localised climate control failures.
Upon arrival, our engineers conducted comprehensive diagnostics on two independent, legacy split air conditioning networks, identifying that four indoor fan coil units (FCUs) were entirely non-operational.
Deep fault-finding procedures revealed that the severe electrical surge from the power cut had critically damaged the external Printed Circuit Boards (PCBs).
Because the existing equipment was 14 years old, the client was faced with an operational crossroads:
Liaising transparently with our intermediary client, Penguin FM, we presented a detailed commercial roadmap outlining the economic risks of maintaining the legacy units versus the immediate sustainability returns of an upgrade. Backed by this data, the decision was made by Wren Kitchens to bypass short-term patches and completely replace the broken assets.
Operating efficiently to minimise disruption to the live retail environment, our HVACR team executed a complete, clean strip-out and modern installation:
Operational ROI & Sustainability Impact Matrix
- Future-Proof Asset Protection: By proactively migrating away from R410A, Wren Kitchens eliminates vulnerability to the skyrocketing maintenance and supply costs driven by the F-Gas phase-out regulations.
- Energy Efficiency Gains: The new R32 architecture significantly lowers electricity consumption per kilowatt of cooling/heating output, instantly reducing the showroom’s ongoing operational overheads.
- Extended System Lifespan: The brand-new system completely resets the asset lifecycle clock, guaranteeing reliable, prolonged climate comfort for both staff and visiting showroom customers.
By moving past standard “break-fix” maintenance and acting as genuine strategic partners, we helped Wren Kitchens transform an unexpected electrical failure into a major victory for their corporate sustainability goals.
By executing all diagnostics, pipework modification, and gas commissioning under one roof, our HVACR team has set a clear benchmark for responsive, commercially minded retail engineering.