HF was commissioned to modernise and expand the electric vehicle charging capacity of a busy public car park in Sunderland, replacing outdated legacy equipment with a high-capacity, future-proof solution.
Our Green Energy team decommissioned 4 existing units and installed 6 Dual 7kW Connected Kerb chargers, providing 12 total charging points. The project required a complete overhaul of the electrical “backbone,” including:


HF’s Green Energy team has successfully completed a comprehensive EV charging infrastructure upgrade at a key car park in Sunderland. This project highlights our ability to not only install renewable technology but to re-engineer the complex electrical distribution systems required to support the growing demand for electric vehicle charging.
The project began with the decommissioning and removal of four legacy EV chargers that were no longer fit for purpose. To meet increasing local demand, the capacity needed to be expanded from four charging points to six, requiring a significant upgrade to the existing electrical supply and distribution network.
HF was tasked with the installation of 6 Dual 7kW Connected Kerb chargers, providing a total of 12 charging outlets. Unlike a standard “bolt-on” installation, our team undertook a full infrastructure overhaul to ensure the new system met the highest safety and performance standards.
Our scope of work included:
In many standard EV installs, single-pole protection is used. However, for this Sunderland project, we prioritised safety by implementing double pole circuit protection. This ensures that in the event of a fault, both the Live and Neutral feeds are disconnected, providing total isolation. A vital safety feature for outdoor, public-facing electrical infrastructure.


The result is a robust, reliable, and user-friendly charging hub. By partnering with Connected Kerb, we have provided the client with a smart, data-driven charging solution that is built to last.
The additional capacity means more commuters and visitors to Sunderland can charge with confidence, while the upgraded “behind-the-wall” infrastructure ensures the local grid remains stable and the equipment remains protected from the elements and electrical surges.
This project required the specialised knowledge of our Green Energy division for the EV technology, combined with the core technical skills of our Electrical division to handle the complex distribution board and cabling requirements.
From technical insights to our latest project updates, stay connected with everything going on at HF.
100 Albert Drive
Glasgow, G41 2SJ
0800 783 9480