A Company Well Connected

Eden Mill

Client Eden Mill
Location St Andrews
Project Value £500,000 +
Completion Date 2025
Project Overview

HF served as a key contractor for Phase 1 of Eden Mill’s ambitious site expansion. The project required complex coordination across five HF divisions to ensure the facility met stringent industrial standards, particularly concerning hazardous area regulations and integration with existing university infrastructure.


Full Project Details

Comprehensive Electrical, Mechanical and Fire & Security Services for Eden Mill’s Expansion in St Andrews

HF was proud to be a key contractor in the exciting new expansion of the Eden Mill site in St Andrews, Fife. With our expertise in electrical, mechanical, fire & security, and automated controls, we delivered a comprehensive range of services that ensured the site was fully operational and compliant with all necessary safety and industry standards. Our ability to coordinate across multiple disciplines, combined with our commitment to quality and safety, made us the ideal partner for this ambitious project.

Electrical Services

Powering the New Facility

Our electricians played a crucial role in Phase 1 of the project, ensuring that the site was equipped with a robust and reliable power infrastructure. We installed a 400 Amp new power supply to handle the site’s operational demands. To ensure efficient electrical distribution, we fitted new power boards and containment systems. Our team also liaised with St Andrews University, who are leasing the land to Eden Mill, to integrate the site’s electrical systems with the existing university infrastructure.

We carried out extensive lighting installations, fitting industrial lighting in all open-plan areas and emergency lighting for the escape stair areas. In high-risk areas like the cask stores and production bays, we installed ATEX-rated light fittings, ensuring compliance with hazardous area regulations.
Our electricians also handled the small power requirements of the site, installing electrical supplies for air compressors and forklift charging stations. Additionally, we completed the wiring for extractor fans and smoke vents, supporting ventilation and fire safety measures. Power supplies were also installed to support various mechanical systems on-site, ensuring all operations ran smoothly.

Summary of Electrical Services:
• Installation of a 400 Amp power supply.
• Fitting of new power boards and containment systems.
• Integration of electrical systems with St Andrews University’s infrastructure.
• Installation of industrial lighting, emergency lighting, and ATEX-rated light fittings.
• Provision of small power supplies for air compressors and forklift charging stations.
• Wiring for extractor fans, smoke vents, and mechanical systems.

Mechanical Services

Supporting Site Infrastructure

Our mechanical engineers were responsible for critical installations that supported both safety and operational efficiency. We installed the new water supply for the site’s sprinkler system tanks, ensuring reliable fire protection. Additionally, we fitted the gas supply for the building, which included a gas booster to maintain a consistent supply, essential for commercial operations.

We managed the incoming water mains, ensuring a steady supply of water for the site and as part of our domestic water services, we installed handwashing stations and an emergency safety shower, supporting hygiene and safety regulations for the new site.

Summary of Mechanical Services:
• Installation of water supply for sprinkler system tanks.
• Fitting of gas supply with a gas booster for consistency.
• Management of incoming water mains.
• Installation of domestic water services, including handwashing stations and an emergency safety shower.

Fire & Security

Ensuring a Safe Work Environment

Our Fire & Security team installed a state-of-the-art fire alarm system tailored to the site’s specific needs. The system was an L1 fire alarm system, offering the highest level of protection, with coverage in all areas of the site. We also installed ATEX flame-rated devices in hazardous zones and ensured that the fire alarm system was integrated with St Andrews University’s fire safety network.

Additionally, we fitted a VESDA Smoke Detection System, an early-warning system that enhances fire safety. The installation included all required interfaces and call points, ensuring optimal functionality.

Summary of Fire & Security Services:
• Installation of an L1 fire alarm system.
• Fitting of ATEX flame-rated fire safety devices.
• Integration of the fire alarm system with St Andrews University’s infrastructure.
• Installation of a VESDA Smoke Detection System with interfaces and call points.

Automated Control Systems

Automated Controls

Streamlining Operations

Our Automated Controls team played a vital role in optimising the site’s day-to-day functionality by designing and installing custom-built control panels. The new control panels were designed to automate the sites process distillation system as well as the sites power distribution for both safety and process. Because we worked closely with our electrical, mechanical and fire & security engineers as ‘A Company Well Connected’, it allowed us to offer the client a seamless transition of our full range of services. A prime example of the benefits of working with HF.

Summary of Automated Controls Services:
• Design and installation of custom-built control panels.
• Seamless integration with electrical & mechanical systems for streamlined operations.

Why HF Group?

As a trusted provider of electrical, mechanical, fire & security, and automated control solutions, HF was perfectly positioned to deliver a full-scope service for Eden Mill’s expansion. Our ability to manage multiple trades under one roof provided a streamlined and efficient project delivery, minimising disruption and ensuring the highest standards of safety and quality.

Our company values—Safety, People, Integrity, and Quality—underpinned every aspect of our work on this project. By prioritising collaboration, technical excellence, and adherence to industry regulations, we successfully delivered a high-specification installation that will support Eden Mill’s operations for years to come.

Eden Mill Distillery Fit Out
Ready to start a project?

Contact our team today to discuss your requirements.

Enquire Now
HF Group Accreditation - ConstructionLine Gold Member
HF Group Accreditation - NSI Gold Fire & Security Member
HF Group Accreditation - BAFE Fire Safety Accredited
HF Group Accreditation - NICEIC Approved Electricians
HF Group Accreditation - Refcom Gas Certification
HF Group Accreditation - Select Approved Electricians
HF Group Accreditation - CHAS Approved Contractors
HF Group Accreditation - SNIPEF Plumbing & Heating Approved Contractor
HF Group Accreditation - OFTEC Approved Mechanical Contractor
HF Group Accreditation - SafeContractor
HF Group Accreditation - Gas Safe Approved Heating Engineers
HF Group Accreditation - Acclaim Accredited
HF Group Accreditation - Emergency Lighting Installer
HF Group Accreditation - Cyber Essentials Accredited
HF Group Accreditation - IFC Smoke Vent Installer Certified
HF Group Accreditation - ISO 414001 2015 Accredited
HF Group Accreditation - ISO 9001 2015 Accredited
HF Group Accreditation - 45001 2018 Accredited
HF Group Accreditation - Daikin Business Partner
HF Group Accreditation - SEPA Certified
HF Group Accreditation - Mitsubishi Accredited Installer
HF Group Accreditation - WaterSafe Approved Contractor
HF Group Accreditation - ConstructionLine Gold Member
HF Group Accreditation - NSI Gold Fire & Security Member
HF Group Accreditation - BAFE Fire Safety Accredited
HF Group Accreditation - NICEIC Approved Electricians
HF Group Accreditation - Refcom Gas Certification
HF Group Accreditation - Select Approved Electricians
HF Group Accreditation - CHAS Approved Contractors
HF Group Accreditation - SNIPEF Plumbing & Heating Approved Contractor
HF Group Accreditation - OFTEC Approved Mechanical Contractor
HF Group Accreditation - SafeContractor
HF Group Accreditation - Gas Safe Approved Heating Engineers
HF Group Accreditation - Acclaim Accredited
HF Group Accreditation - Emergency Lighting Installer
HF Group Accreditation - Cyber Essentials Accredited
HF Group Accreditation - IFC Smoke Vent Installer Certified
HF Group Accreditation - ISO 414001 2015 Accredited
HF Group Accreditation - ISO 9001 2015 Accredited
HF Group Accreditation - 45001 2018 Accredited
HF Group Accreditation - Daikin Business Partner
HF Group Accreditation - SEPA Certified
HF Group Accreditation - Mitsubishi Accredited Installer
HF Group Accreditation - WaterSafe Approved Contractor

Our Latest News

From technical insights to our latest project updates, stay connected with everything going on at HF.

Head office

100 Albert Drive
Glasgow, G41 2SJ

Contact us

0800 783 9480