Brief project description: OI Manufacturing required sprinkler protection within their basement cullet systems, OI Glass is made in more than 20 countries around the globe. They create innovative, distinctive and beautiful glass packaging that builds brands and drives consumer intrigue. They produce over 1 million glass bottles per day from the Alloa site.
Project Challenges : All installation works had to take place with no disruption to production, the basement is underneath the forming machines and any glass bottles not deemed acceptable are pushed down the pipework toward the cullet system for regeneration.
This essentially means that bottles holding temperatures of over 1000c are sliding down the system creating a possible fire risk. HF created a fire safety plan for working within this area as well as erecting scaffolding and engineer protection.
In total HF installed 5 systems covering all areas of the basements deemed a fire risk.
Customer quotes: HF carried out the works in line with the relevant RAMS and performed the installation to a high standard. Clear communication was essential and again, HF performed their duties extremely well
Discover our full range of capabilities within the Food & Drink Sector. Find out more
Our electricians complete Electrical Installation for Larkhall Professional and Businessmen’s Club in Collaboration with Larkhall Academy We were proud to have been involved in the successful completion of electrical work for the Larkhall Professional and Businessmen’s Club’s (LPBC) latest community project, in partnership with Larkhall Academy – a crafted stained glass window panel. This project, […]
accreditation-1
accreditation-1
accreditation-1
accreditation-1
accreditation-1
accreditation-1
accreditation-1
accreditation-1
accreditation-1
OFTEC accreditation
EV Charging Grant Eligibility
Are you considering purchasing an electric vehicle?
Did you know that there is currently an incentive grant available that can lower the up front costs of installing an EV Charge Point?
You can find out if you are eligible simply by answering some simple question.
Do you own or are in the process of purchasing an electric vehicle?
Question 2
Do you have off road parking or a designated parking space?
Question 3
Do you have access to the EVC Network?
That’s great!
There are currently incentive grants available to reduce the cost of installing an EV Charge Point at your property.
To find out if you are eligible for an EV grant and to generate a quote for your EV Charging Point installation from HF Group, please click the button below.
Based on your answers, unfortunately we do not believe that you are currently eligible for a Government grant for your new EV charging installation.
However….as one of the leading electrical contractors in the UK, we can still install your EV charging station.