Client: Greene King, Angus, Dundee, Scotland
Project length: 3 months
Project value: £46k
Completion date: March 2018
HF divisions involved: Electrical
Brief project description: We re-wired lighting and power circuits within 12 bedrooms on behalf of Nicolson Decorators for Greene King. New USB sockets were fitted at bedheads and new modern lighting installed. New distribution boards were installed to bring the regulations up to current standard.
We refurbished the lounge bar by altering existing power and lighting circuits. The existing switch bank was moved to accommodate a new ladies toilet. New USB sockets were fitted at seating booths and new lighting installed throughout.
Project Challenges: The property is made up of 3 traditional cottages that have been merged into 1. We installed cables within the fabric of the building without damaging the traditional features. Despite ‘The Beast From The East’, we still managed to hand over the project on time, much to the clients delight.
Customer quotes: “The existing condition of the electrics were challenging to say the least and HF carried out their works to their usual high standard and kept ourselves and our mutual client informed throughout the project. The end result transformed the look of the various areas and the client was extremely satisfied on completion” Barrie Nicolson – Joint Managing Director, Nicolson Decorators
Focussing on the Environment At HF, we are deeply committed to fostering a safer and more sustainable future, both for our company and for the communities in which we operate. As we move into October, our focus turns to one of the most pressing issues of our time: the environment. We believe that by placing […]
Did you know that there is currently an incentive grant available that can lower the up front costs of installing an EV Charge Point?
You can find out if you are eligible simply by answering some simple question.
Ready to begin? Click here