loader image
Apprenticeship Opportunities

Manned 24 hour Call-out Service

Clearways Yard, Belfast Harbour – Electrical System Controls


Client: Clearways
Project length: 30 months
HF divisions involved: Electrical, Automated Controls

We are about to start on-site works for complete shredder plant and ancillaries at Ireland’s largest scrap processing plant located at Clearways main yard in Belfast harbour.

This will be a full scale system integration of all electrical aspects of plant from 33kV design/supply and installation down to optical Ethernet networks and PLC control system.

Project Time: 24 months (development and design), 6 months installation

Contract value: £750 ,000

electrical systems for automated controls electrical systems design electrical control systems
facilities management case studies
CASE STUDIES

Browse our latest case studies...

LATEST NEWS
Let Glasgow Flourish Awards 2023 Gold Certificate

Since the early 90’s we have, every spring hung flower points outside the office of our Glasgow branch because we feel that it is important to give something back to our local community, helping to Glasgow flourish. Which is why we are proud to have once again received an award from the ‘Let Glasgow Flourish […]

  • NSI Gold Fire & Security
    NICEIC Electrical Contractor
    Gas Safe Engineers
    REFCOM accredited heating engineer
    Select Electrical Contractors
    construction line accreditation
    CHAS Accredited contractor
    SMI PEF Contractor
    BAFE Fire Safety Registered Contractor
    OFTEC Registered Heating Business
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    OFTEC accreditation